Rack Part Almost Done

Rewire project is coming along nicely. The rack part is almost done, hardest part is to get the 4 channel LAG down to the server room. There are some cosmetic things that need to be done though. Need to cover … Continue reading

Posted in New Toys, Technical, Training, Weigh In | Leave a comment

Getting New Core Stack

New Server Core stack is functional but not in production. I got it pretty much configured the way I want it to be. Tomorrow going to put it in its spot, then maybe work on firewall. 10G seems to work, … Continue reading

Posted in New Toys, Technical, Training, Weigh In | Leave a comment

Continuing Rewire Project

Today I finally got to do some fun stuff. Racked and got my new equipment ready. New Switches, new cameras and new access points. This was fun not work. Weight: 324.8

Posted in New Toys, Technical, Training, Weigh In | Leave a comment

Appraisal Done

Been a long few days, today finally got to relax. House is good too, kind of don’t want to touch anything it is so nice. Slowly need to unpack and toss stuff now. For now I get to play with … Continue reading

Posted in New Toys, Technical, Training, Weigh In | Leave a comment

House Clean

Its been a while since the house was this clean. It looks great. Ready for the appraiser. Hoping to get the valuation we need. Otherwise, looking to at least get a refi at a low rate. Should get something out … Continue reading

Posted in Training, Weigh In | Leave a comment

Another Power Outage

Power went out at 1:15PM for another hour again. Got it back up, but disrupted my workflow. Beat up, behind schedule. Now in the compromise mode. Did mow lawn and clean up some things. Going to bed early. Weight: 321.0

Posted in Technical, Training, Virtualization, Weigh In | Leave a comment

Getting Close to A Day

Appraisal day Things looking good. House looks great. Also got official word that CRV is a total loss. Loan is proceeding well, things are gonna happen fast. Figured out how to sign a cert for the Unifi Controller. Youngest in … Continue reading

Posted in New Toys, Technical, Training, Weigh In | Leave a comment

Moving Work To Top Floor

I consider my part downstairs done. It is nice now, painted, cables all nice, dusted, clean. Started working upstairs, a lot to go still, but there is progress. Tomorrow kind of the last chance, cause most of family is home … Continue reading

Posted in Training, Weigh In | Leave a comment

A Lot Done Today

Got another load into storage, purchased some things we needed, and got first coat of paint downstairs. Wasn’t expecting to paint, but here we are. Now we are behind in a lot of things we are trying to do. Starting … Continue reading

Posted in Training, Weigh In | Leave a comment

Downstairs Almost Done

Will start upstairs tomorrow, but I think we are at a point where we can begin upstairs. I think it is still relatively fresh upstairs so hopefully not as much work. It started raining again though, may have to cut … Continue reading