End of Lent 2020

Made it, just need to last 26 hours with no food, and the ambien… I can take after midnight so just two hours.

Anyway, I want to hold off longer. See if I can make it to the weekend.

Taking my network thing a piece at a time.

I got the overall plan, I got the Windows 7 Clients with sysprep, need to figure out if the DC will be Windows 2008R2, 2012, or 2016. Really really leaning towards 2016.

After the server I will get a Windows 10 Server.

I am concurrently building the Linux Server

Weight: 302.8

This entry was posted in Technical, Training, Virtualization. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.