Walked late again today, maybe I should be more careful, was pretty darn icy

Got a lot done on the tech side today, made use of the lab to test out building linux servers.
I can rebuild a 3 node lab in under 30 minutes.
I started at 11:30PM lets see if I am done before midnight.
I am back, I was able to get it to a base state before 11:40
Back again, was able to get it down to right before patching. That will take a bit cause it has to go to the Internet, but about 15 to 20 minutes.
Weight: 325.8